A&D OP-11 Installation Manual Page 47

  • Download
  • Add to my manuals
  • Print
  • Page
    / 182
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 46
07/2011 2 Operating A&D DataManagement
2.4 Specifying the properties of the control components
© Siemens AG 2011 All Rights Reserved
SIMATIC A&D DataManagement Client - 07/2011
2-47
S5 program button
Selects the path of the STEP5 project with a file browser. Acceptance is
possible by double clicking on the STEP5 project file.
Multibackup
This option enables the user to store up to 99 memory dumps of the
component. The number is specified in Max. no. of backups, also see
Subsection 2.4.1 and Subsection 2.6.2.
"OK" button
Transfers the entry and acknowledges the dialog positively.
Cancel button
Discards the entries and acknowledges the dialog negatively.
"Hel2 button
Help for the current entry fields.
2.4.4 S7 Component
All S7-300, S7-400 CPUs and the PC-based Win AC controls belong
to the S7-CPUs.
Because of the source data concept, the "S7-CPU" is only loaded and compared.
The "S7-CPU" is stopped before the transfer and then restarted afterwards.
However, there is an option of creating a backup of a "S7 CPU".
The Properties of the "S7 component" dialog enables the following settings to be
made:
"Transfer AS configuration" option.
You transfer the hardwarecomponent, created with "HW config", to the
automationsystem (from the SDBs of the STEP7 project) with this option.
Page view 46
1 2 ... 42 43 44 45 46 47 48 49 50 51 52 ... 181 182

Comments to this Manuals

No comments